Cut Data Center Power Use Without Slowing Down

Card No. 06·6195 · Updated · Standard formula, shown below

This guide shows you how to reduce data center power consumption without sacrificing performance. You’ll learn practical, low-risk steps that target the biggest power draws—cooling, idle servers, and inefficient power conversion—while keeping your workloads running at full speed. No hardware replacements are required for most steps; you’ll mainly adjust settings, consolidate workloads, and monitor results.

What You’ll Need

  • Access to your data center’s management interfaces (hypervisor, cooling system, UPS, and monitoring tools).
  • Current power usage data (from your UPS, PDU, or facility management system).
  • Workload inventory: which servers run what, and when they’re busy vs. idle.
  • Permission to change settings (or a request process to get it).

Step-by-Step

  1. Measure your baseline. Record total facility power draw, per-rack draw, and per-server draw for one week. Note the peak and average values. You can’t improve what you don’t measure.
  2. Raise the server inlet temperature. Most data centers run cooling at 18-20°C (64-68°F). ASHRAE recommends up to 27°C (80°F) for many equipment classes. Increase your cooling setpoint by 1-2°C per week, monitoring server inlet temps and any thermal throttling. Each degree can save 2-5% of cooling energy.
  3. Use hot/cold aisle containment. If you don’t have it, install blanking panels in empty rack spaces and seal gaps around cables. This prevents hot air from recirculating into cold aisles, allowing you to raise the setpoint further without risk.
  4. Enable CPU power management. On your hypervisors (VMware, Hyper-V, KVM), switch the power policy from “High Performance” to “Balanced” or “Power Saver.” This lets CPUs drop to lower P-states when idle, cutting server power by 10-30% with negligible latency impact for most workloads.
  5. Consolidate idle VMs. Use your hypervisor’s built-in dynamic optimization (e.g., VMware DRS, Hyper-V dynamic optimization) to move VMs onto fewer hosts during off-peak hours. Then put the empty hosts into standby or power them off. Even a 10% consolidation can reduce facility power by 5-8%.
  6. Turn off unused servers. Identify “comatose” servers—running but with no active workloads for weeks. Power them off (or at least suspend them). If they’re needed for compliance, schedule them to run only during required windows.
  7. Replace old power supplies. If you have servers older than 5 years, their power supplies may be only 70-80% efficient. Newer 80 Plus Platinum or Titanium units are 94-96% efficient. Replacing just the PSU in a 500W server can save 30-60W per server, 24/7.
  8. Optimize cooling airflow. Remove under-floor obstructions, ensure perforated tiles are placed only in cold aisles, and check that fans on CRAC/CRAH units are running at the right speed. Many units have variable-speed drives that are misconfigured to run at 100%.
  9. Use free cooling. In cooler climates, use outside air or water-side economizers when the ambient temperature is below ~10°C (50°F). This can cut cooling energy by 50-80% during those periods.
  10. Monitor and adjust. After each change, wait 24-48 hours and compare the new power draw and performance metrics (latency, CPU utilization, error rates). If performance is unchanged and power is lower, keep the change. If not, revert.

Common Mistakes

  • Raising temperature too fast. Jumping from 20°C to 27°C in one day can cause thermal throttling or hardware failure. Do it gradually, 1-2°C per week.
  • Ignoring humidity. ASHRAE also recommends a humidity range (typically 20-80% RH). If you raise temperature without adjusting humidity, you risk static discharge or condensation.
  • Powering off hosts without checking for single points of failure. If a VM is the only instance of a critical service, powering off its host during off-peak could still cause downtime if another host fails.
  • Assuming all workloads are latency-insensitive. A database with sub-millisecond requirements will not tolerate CPU power saving as well as a batch job. Test each workload class separately.
  • Forgetting about the network and storage. Switches and storage arrays also consume power. Turn off unused ports and enable power-saving features where available.

Tips

  • Start with the lowest-risk changes: blanking panels, raising temperature, and enabling CPU power management. These require no hardware changes and have immediate payback.
  • Use a power monitoring tool that shows per-server and per-rack data. This helps you identify the worst offenders quickly.
  • Schedule consolidation to run automatically during off-peak hours, and reverse it before peak hours. Most hypervisors can do this natively.
  • For cooling, set a deadband of 2-3°C on your thermostat to prevent short-cycling of compressors.
  • Consider using DC power distribution (e.g., 380V DC) for new deployments—it eliminates multiple AC/DC conversions, saving 5-10% of power.

Troubleshooting

  • Performance degraded after raising temperature. Check for thermal throttling in the server’s system event log. If present, lower the setpoint back by 1°C and ensure cold aisle containment is sealed properly.
  • Power savings are minimal. Your servers may already be efficient, or your cooling system is not the main consumer. Re-check your baseline breakdown—if IT equipment is 80% of power, focus there, not on cooling.
  • VMs won’t consolidate. Check for resource reservations, affinity rules, or licensing constraints that prevent them from moving. You may need to manually migrate a few VMs at a time.
  • Humidity alarms go off. When raising temperature, the relative humidity drops. If it falls below 20%, add a humidifier or lower the temperature slightly. If it’s above 80%, you may need to reduce cooling or add a dehumidifier.
  • UPS efficiency drops. Some UPS units are less efficient at low load. If you consolidate to a few hosts, you may be running the UPS at 10% load, which is inefficient. Consider turning off redundant UPS modules if you have them.

Frequently Asked Questions

  • Will raising the temperature void my hardware warranty? Most major server vendors (Dell, HPE, Cisco) follow ASHRAE guidelines and support inlet temperatures up to 40°C (104°C) for certain classes. Check your specific hardware documentation, but 27°C is generally safe.
  • How much can I realistically save? Typical savings range from 10-30% of total facility power, depending on how wasteful your current setup is. The biggest wins come from cooling setpoint increases and server consolidation.
  • Is it safe to power off servers every night? Yes, if you have proper orchestration. Just ensure that the servers are cleanly shut down and that VMs are migrated off first. Frequent power cycles are safe for modern hardware.
  • Does CPU power management affect latency? For most workloads, the transition from idle to full speed takes microseconds. Only ultra-low-latency trading or real-time systems might be affected. Test your specific application.
  • What is the ideal temperature for a data center? ASHRAE’s recommended range is 18-27°C (64-80°F) for most equipment. The “ideal” is the highest temperature that doesn’t cause throttling or violate your hardware’s specs, as that minimizes cooling energy.
  • Can I use outside air cooling in a hot climate? Only when the outside air is cooler than your return air temperature. In hot climates, you may only get a few hours per year of free cooling, so it’s not worth the investment.