keepcalculator

06 Numbers and Powers

Data Center Approval: Questions to Ask First

Card No. 06·74910 · Updated · Standard formula, shown below

Before your community approves a data center, you need to ask about water use, noise, power demand, emergency backup, and long-term tax agreements. This article outlines the key questions that residents, planning boards, and local officials should raise during the permitting process, so the community can make an informed decision.

Background: Why Data Centers Are Different from Other Developments

Data centers are not like offices or warehouses. They run 24/7, consume enormous amounts of electricity, and need constant cooling to keep servers from overheating. A single large facility can draw as much power as a small town. This changes the questions a community should ask. Instead of asking only about traffic and property values, you must ask about the electrical grid, water supply, noise, and what happens when the power goes out.

Data centers are often built in phases, meaning the first building may be just the beginning. A developer may seek approval for one building now and plan to expand later. The initial approval should cover the full build-out, not just the first phase, or the community may lose leverage later.

How a Data Center Works: Power, Cooling, and Redundancy

Data centers store computer servers that run websites, cloud services, and business applications. The servers generate heat, so cooling systems run constantly. Most facilities use one of two cooling methods:

  • Air cooling: large fans push outside air through the building, or chillers cool recirculated air.
  • Liquid cooling: chilled water or coolant runs through pipes near the servers.

Power is the other major component. The facility needs a reliable electricity supply, often from the local utility, plus backup generators for outages. These generators typically run on diesel or natural gas and are tested regularly. The noise from cooling fans and generators is a common neighborhood complaint.

Redundancy means having backup systems: multiple power feeds, batteries, and generators. Ask what level of redundancy the facility will have, because that determines how many generators and how much fuel will be stored on site.

Key Questions to Ask About Water and Cooling

Water is often the most overlooked issue. Some data centers use evaporative cooling, which consumes millions of gallons per year. Others use closed-loop systems that recycle water, but still need a steady supply for makeup and humidity control.

Ask these water-related questions:

  • How much water will the facility use per day, on average and at peak?
  • What is the source of the water – municipal supply, well, or recycled? Is there a long-term contract?
  • Will the facility use evaporative cooling towers, and if so, what is the water discharge temperature and chemical treatment?
  • What happens during a drought or water shortage – can the facility switch to air cooling or reduce operations?
  • Will the water use affect local rates or availability for homes and farms?

In water-stressed regions, a data center can consume more water than a hospital or a large school. The community should ask for a water budget and a plan for dry years.

Power and Grid Impact: What to Ask the Utility and Developer

Data centers need high-voltage power lines and substations. The local utility may need to upgrade infrastructure, and those costs can be passed to ratepayers. Ask:

  • How much electricity will the facility draw at full build-out, in megawatts?
  • Will the developer pay for new substations, transformers, and transmission lines, or will the cost be socialized across all ratepayers?
  • What is the expected timeline for grid upgrades, and will the facility be able to operate before those upgrades are complete?
  • Will the facility use renewable energy credits or on-site solar? If so, what happens when the sun isn’t shining?
  • Are there any grid reliability concerns – will the data center cause brownouts or voltage fluctuations for nearby homes?

Some data centers sign agreements with utilities that allow them to be curtailed (reduce power use) during peak demand. Ask if that is part of the plan, and what compensation the developer receives for agreeing to curtailment.

Noise, Light, and Construction Impacts

Data centers are noisy. Cooling fans, chillers, and generators produce a constant hum that can carry for hundreds of meters. Construction is also disruptive, with heavy trucks, concrete work, and long hours.

Ask for:

  • A noise study that models sound levels at the nearest homes, both during construction and operation.
  • Specific noise limits (in decibels) for daytime and nighttime, and a plan for enforcement.
  • Details on generator testing – how often, at what time of day, and for how long.
  • Lighting plans – will the facility have bright exterior lights or 24-hour security lighting that affects neighbors?
  • Construction hours, truck routes, and dust control measures.

Many communities negotiate a noise mitigation plan that includes sound walls, quieter cooling equipment, or restrictions on generator testing during night hours. Get those commitments in writing as part of the approval.

Emergency Preparedness and Safety

Data centers store fuel for generators, use large amounts of electricity, and may contain batteries that can catch fire. Ask about safety and emergency response:

  • How much fuel will be stored on site, and in what type of tanks? Is there a spill containment plan?
  • What is the fire suppression system – water, gas, or a combination? Will the local fire department be trained to respond?
  • What happens during a prolonged power outage – how long can the facility run on backup power, and what is the refueling plan?
  • Are there any hazardous materials used in cooling or battery systems, and how are they stored and disposed of?
  • Will the facility have a security plan that includes fencing, cameras, and access control?

Lithium-ion batteries used for uninterruptible power supply (UPS) can catch fire and are difficult to extinguish. The community should ask about battery type, quantity, and fire code compliance.

Tax Revenue and Economic Impact: The Real Numbers

Data centers are often touted as job creators and tax generators, but the reality is more nuanced. They create relatively few permanent jobs – mostly security and maintenance – compared to their size. The tax benefits may come from property tax abatements that reduce revenue for schools and local services.

Ask for:

  • A full tax impact analysis that shows property tax revenue with and without the data center, including any abatements.
  • The number of permanent jobs and the average wage, and how that compares to the local median.
  • The cost of providing municipal services (water, sewer, police, fire) to the facility.
  • Any infrastructure costs that will fall on the community, such as road upgrades or water main extensions.
  • The length of any tax abatement and what happens when it expires.

Some communities have found that a data center pays less in taxes than a comparable office building because of the low number of employees and high depreciation. The community should compare the data center to other potential uses of the land.

Alternatives and Negotiation Points

Before approving a data center, consider alternatives and negotiation points:

  • Can the facility be located on land that is already zoned for industrial use, away from homes?
  • Can the developer reduce water use by using air cooling or a closed-loop system?
  • Can the facility use on-site solar or wind to reduce grid demand?
  • Can the community require a community benefits agreement, such as funding for local schools or parks?
  • Can the approval be phased, with each phase requiring a separate review?

Many communities have successfully negotiated for larger setbacks, lower noise limits, and financial contributions to local infrastructure. The key is to ask these questions early, before the approval is finalized.

Frequently Asked Questions

Do data centers create many jobs?

No, not many. A large data center may employ only 30-50 people for operations and security. Construction jobs are temporary. The economic benefit is mostly tax revenue, which can be reduced by abatements.

Are data centers bad for the environment?

They use a lot of electricity and water, and they generate heat and noise. However, some facilities use renewable energy and efficient cooling. The environmental impact depends on the local energy mix and water availability.

Can a data center cause power outages for residents?

It can, if the local grid is not upgraded to handle the load. Ask the utility for a grid impact study. In some areas, data centers have strained the grid, leading to rate increases or reliability issues.

How much water does a data center use?

It varies widely. A large facility with evaporative cooling can use millions of gallons per year, similar to a small town. Air-cooled facilities use much less. Ask for a water budget specific to the proposed design.

What is a tax abatement, and why do data centers get them?

A tax abatement is a temporary reduction in property taxes, often granted to attract investment. Data centers are capital-intensive, so they may receive abatements for 10-20 years. This means the community gets less tax revenue during that period.

Can the community reject a data center?

Yes, if the zoning does not allow it, or if the environmental and infrastructure impacts are too great. However, if the land is already zoned for industrial use, the community may have limited options. The approval process is the time to negotiate conditions.

Related

Method: the standard formula for this calculation, rounded as each result states. See how the calculators work or report an error.

More cards in this drawer

The whole Numbers and Powers drawer →