Before moving workloads to a data center, you must evaluate your application’s latency sensitivity, security and compliance requirements, cost structure, and operational control needs. This article outlines the critical technical, financial, and practical factors to weigh so you can decide whether a data center, colocation, or cloud approach fits your workloads.
Why Move Workloads to a Data Center?
Organizations move workloads to a data center for several reasons: to gain more reliable power and cooling, to improve physical security, to reduce on-premises maintenance burden, or to consolidate IT infrastructure. A data center provides a controlled environment with redundant power, cooling, and network connectivity, which is often more robust than a typical office closet or small server room. However, moving is not a single decision—it involves choosing between a managed data center (where you rent space and the provider handles some infrastructure), colocation (where you rent space, power, and cooling but manage your own hardware), or a fully cloud-based solution. Each model shifts different responsibilities to the provider, and the right choice depends on your team’s skills, budget, and compliance needs.
Key Factors to Evaluate Before the Move
Before signing a contract, assess these core areas:
- Latency and network performance: If your users or customers are geographically dispersed, a data center far from them will add delay. Run latency tests from your primary user locations to the candidate facility.
- Compliance and data residency: Some industries (healthcare, finance, government) have strict rules about where data can be stored and who can access it. Verify the data center can meet those requirements (e.g., HIPAA, GDPR, PCI DSS) and provide audit trails.
- Security and physical access: Check for 24/7 monitoring, multi-factor authentication for entry, CCTV, and secure cages. Ask about their incident response procedures.
- Power and cooling redundancy: Look for N+1 or 2N redundancy in power and cooling systems. Ask about backup generator fuel capacity and how long they can run without utility power.
- Connectivity and carrier options: Ensure the facility has multiple fiber providers and low-cost cross-connects to cloud providers if you plan a hybrid setup.
- Scalability and contract flexibility: Can you add more racks or power without renegotiating? What are the exit terms if you need to leave?
Costs: More Than Just Monthly Rent
The price of a data center is not a single line item. You will typically pay for:
- Space: Per rack or per square foot.
- Power: Per kilowatt-hour or per circuit, plus a demand charge for peak usage.
- Bandwidth: Data transfer in/out, often billed per Mbps committed or per GB.
- Cross-connects: Cables between your rack and carriers or cloud providers, usually a monthly fee each.
- Professional services: Installation, remote hands (technicians who perform tasks for you), and monitoring.
Also factor in the cost of moving equipment (shipping, insurance, downtime) and any decommissioning of your old server room. Compare the total cost of ownership (TCO) over 3-5 years against keeping workloads on-premises or moving to the cloud. For unpredictable workloads, cloud might be cheaper; for steady, high-utilization workloads, colocation often wins.
How to Choose a Data Center Provider
Start with a shortlist of facilities within a reasonable distance from your users (or with good network peering). Then:
- Visit the site: Walk through the facility, check for cleanliness, security, and signs of proper maintenance. Ask about their uptime history (SLA) and verify with independent audits (e.g., Uptime Institute Tier certification).
- Review the SLA: What is the guaranteed uptime? What credits do you get if they fail? Are there exclusions for scheduled maintenance?
- Check financial stability: Data center closures happen. Ask about the provider’s financial health and their track record.
- Talk to existing customers: Ask for references and inquire about support responsiveness, billing accuracy, and how they handle outages.
- Test the network: Request a trial connection or a temporary cross-connect to measure latency and throughput from your offices.
Common Pitfalls and How to Avoid Them
Many migrations stumble on avoidable mistakes:
- Underestimating power requirements: Servers rarely run at nameplate power, but overprovisioning can lead to breaker trips. Measure actual power draw with a PDU meter before sizing.
- Ignoring cooling density: High-density racks (e.g., GPU servers) may need specialized cooling. Ask the provider about maximum kW per rack and whether they can support hot/cold aisle containment.
- Forgetting about remote hands: If you are not on-site, you will need staff to reboot servers, replace failed disks, or handle cabling. Check the cost and availability of remote hands.
- Not planning for the move itself: Moving hardware requires careful labeling, graceful shutdown, and transport that avoids static and vibration. Plan a weekend window and have a rollback plan.
- Overlooking the network edge: Your data center is only as good as the connectivity to your users. If you have offices in different regions, consider a multi-site strategy or a CDN for static content.
Data Center vs. Cloud vs. On-Premises
This decision is not binary. Many organizations use a hybrid approach:
- On-premises: Best for legacy systems with low latency requirements and where you have skilled staff. But it lacks the redundancy and scalability of a data center.
- Colocation: You own the hardware but rent the facility. Good for predictable workloads, compliance (you control the data), and cost savings over a full data center build.
- Managed data center: The provider also manages the hardware and sometimes the OS. Reduces your operational burden but less control.
- Cloud: Best for elastic workloads, rapid scaling, and avoiding capital expenditure. But it can be expensive for steady, high-traffic loads and may have data egress fees.
A common misconception is that cloud is always cheaper. For a workload that runs 24/7 with predictable usage, colocation can be significantly less expensive than reserved cloud instances. Conversely, for spiky workloads, cloud’s pay-as-you-go model is more economical. Calculate your actual usage patterns before choosing.
Security and Compliance Considerations
Data centers do not automatically make you compliant. You are still responsible for securing your applications and data. Key points:
- Encryption: Encrypt data at rest and in transit. The data center provider may offer encryption options, but you must manage keys.
- Access control: Implement strong authentication for anyone accessing the facility, including your own staff. Use biometrics and multi-factor authentication.
- Audit logs: Ensure the provider gives you logs of who enters your cage and when. You may need these for compliance audits.
- Data destruction: When you decommission drives, use a certified destruction service. Verify the provider’s process for disposing of retired hardware.
Frequently Asked Questions
How long does a data center migration take?
It depends on the number of servers and the complexity of your network. A small migration (10-20 servers) can take a few days of planning and a weekend to execute. Larger migrations with databases and dependencies can take weeks or months. Plan for at least 2-3 months from contract signing to cutover, including testing.
What is the difference between Tier II and Tier III data centers?
Tier levels (from the Uptime Institute) indicate redundancy. Tier II provides redundant power and cooling components (N+1) but a single distribution path. Tier III provides N+1 redundancy and dual distribution paths, allowing maintenance without downtime. Tier IV adds fault tolerance with 2N redundancy. Higher tiers cost more but offer better uptime.
Can I move my existing servers to a data center without reconfiguring them?
Yes, but you will need to update network settings (IP addresses, DNS, firewall rules) and possibly storage connections. Plan to re-cable and re-test everything. It’s wise to do a dry run in a lab if possible.
Do I need to buy new hardware for colocation?
No, you can bring your own servers. However, check the data center’s power and cooling specs to ensure they support your equipment. Older servers may be inefficient and cost more in power, so it may be worth upgrading.
How do I ensure my data is safe during the move?
Take full backups before the move, and test the backups. Use a professional moving service that specializes in IT equipment. Label everything, and have a checklist for power-down and power-up procedures. Consider moving non-critical workloads first to validate the process.
What happens if the data center has an outage?
Most facilities have backup generators and UPS systems. Your SLA will define the expected uptime and credits. You should still design your applications for high availability (e.g., redundant servers across racks or sites). Test your disaster recovery plan regularly.
Related
Method: the standard formula for this calculation, rounded as each result states. See how the calculators work or report an error.
More cards in this drawer
- Best BitLocker Readers for Mac: 6 Picks
- AI Data Center Cooling Efficiency & Tokens per Watt
- Best Enshrouded Server Settings for Co-op Survival
- Samsung J5 Prime FRP Bypass: What Actually Works
- Battery Size vs. Real-World Phone Battery Life
- Choosing the Right Backup for Your Nonprofit