Building Information Modeling (BIM) is a digital way of working where a project’s physical and functional characteristics are stored in a shared 3D model, and teams share information across a project primarily through a Common Data Environment (CDE) — a central online repository that controls access, versioning, and approvals. From there, information flows through standardized file formats like IFC and BCF, and through software-specific cloud collaboration platforms that sync changes in near real-time. This article explains the main channels, formats, and workflows that make BIM information sharing work in practice.
Formula
The calculator above works out average pace and speed from a finish time and a distance. The formulas are:
- Pace (min/km) = Finish time (min) ÷ Distance (km)
- Speed (km/h) = Distance (km) ÷ (Finish time (min) ÷ 60)
Variables:
- t – finish time in minutes (min)
- d – distance in kilometers (km)
- pace – time per kilometer (min/km)
- speed – kilometers per hour (km/h)
Worked Example
Using the default values: finish time = 50 minutes, distance = 10 km.
- Pace = 50 ÷ 10 = 5.00 min/km
- Speed = 10 ÷ (50 ÷ 60) = 10 ÷ 0.8333 = 12.00 km/h
The calculator returns a pace of 5.00 min/km and a speed of 12.00 km/h.
What Is a Common Data Environment (CDE)?
A CDE is the agreed-upon central space where all project information is stored, managed, and shared. It is not a single software product but a set of processes and tools that ensure everyone works with the same, current version of the model and documents. The CDE typically has four states: Work in Progress (files being developed, visible only to the authoring team), Shared (approved files visible to the whole project team), Published (files issued for construction or handover), and Archive (historical record). Each state has its own access permissions and approval workflows.
Common CDE platforms include Autodesk Construction Cloud (BIM 360/ACC), Bentley ProjectWise, Trimble Connect, and open-source options like Bimsync. These platforms provide version control, audit trails, and role-based access so that a structural engineer does not accidentally overwrite an architect’s model.
Standard File Formats for Sharing
To share information between different software tools, BIM relies on open standards:
- IFC (Industry Foundation Classes) – an open, neutral data format for exchanging building models. It is maintained by buildingSMART and is the most widely used interoperability format. IFC files contain geometry, properties, and relationships between elements.
- BCF (BIM Collaboration Format) – a file format that stores issues, comments, and screenshots linked to specific points in a model. It allows team members to communicate about problems without sending the whole model.
- COBie (Construction Operations Building Information Exchange) – a spreadsheet-based format for exchanging facility management information, such as equipment lists, warranties, and maintenance schedules.
- Native file formats – each software (Revit, ArchiCAD, Tekla, etc.) has its own file format. These are shared within the same software ecosystem or converted to IFC for cross-platform exchange.
How Teams Actually Share Information
In practice, information sharing happens through several complementary channels:
- Cloud-based model coordination – teams link their models to a central cloud service, and changes are synchronized automatically when a team member saves. For example, an architect in Revit can link the structural engineer’s Revit model, and when the engineer updates it, the architect sees the changes after a manual reload.
- File-based exchange – for teams using different software, models are exported to IFC and then imported into the other tool. This is often done on a weekly or milestone basis.
- Issue tracking – using BCF, team members create issues in a shared platform, assign them to the responsible party, and track them until resolved. This avoids email chains and ensures no issue is lost.
- Meetings and dashboards – project dashboards show the status of models, issues, and approvals. Regular coordination meetings review the latest shared models and decide on next steps.
Choosing the Right Sharing Method
The best method depends on the project size, software mix, and team location. Consider these factors:
- Software compatibility – if everyone uses the same software, native cloud collaboration is easiest. If not, IFC and BCF are essential.
- Project size – large projects with many disciplines benefit from a formal CDE with strict approval workflows. Small projects may manage with a shared cloud folder.
- Internet connectivity – cloud-based collaboration requires reliable internet. For remote sites with poor connectivity, file-based exchange may be more practical.
- Client requirements – many public projects mandate a specific CDE or open standards. Check the contract before choosing.
Common Problems and How to Avoid Them
Information sharing in BIM often fails due to:
- Version confusion – when multiple people work on the same file without a CDE, old versions get overwritten. Solution: use a CDE with check-in/check-out and version history.
- Data loss during conversion – IFC export/import can lose some properties or geometry. Solution: agree on a mapping standard and test conversions early.
- Unclear ownership – if it is not clear who is responsible for updating which part of the model, information becomes stale. Solution: define roles and responsibilities in a BIM Execution Plan.
- Security concerns – sharing models over the cloud raises data security issues. Solution: use platforms with strong encryption and access controls, and sign data-sharing agreements.
Costs of Setting Up Sharing
The cost of BIM information sharing includes software licenses, cloud storage, training, and the time spent on coordination. Open-source tools like BlenderBIM and free viewers can reduce costs, but they may lack advanced features. Cloud storage costs depend on the size of the models and the number of users. Training is often the largest hidden cost – team members need to learn both the tools and the new workflows.
Safety and Data Integrity
When sharing BIM data, consider data security and integrity. Use encrypted connections, set up access permissions, and back up data regularly. For critical infrastructure, follow industry security guidelines. Also, ensure that the shared model is validated for clashes and errors before it is used for construction, since errors in the model can lead to real-world safety issues.
Alternatives to a Full CDE
Not every project needs a full CDE. Alternatives include:
- Shared network drives – simple but risky for version control.
- Email attachments – only suitable for very small projects with occasional exchanges.
- Peer-to-peer file sharing – tools like Dropbox or Google Drive can work if teams are disciplined about file naming and versioning.
- Model viewers with issue tracking – some tools allow viewing and commenting on models without full authoring capabilities, which can be enough for coordination.
Frequently Asked Questions
What is the difference between IFC and native file formats?
Native formats are specific to a software (e.g., .rvt for Revit). IFC is an open format that can be read by many different software programs. Native formats preserve all features, but IFC ensures that everyone can access the model regardless of their software. IFC is the standard for interoperability, while native formats are best for internal collaboration within the same software.
How often should models be shared?
It depends on the project phase. During design, weekly or bi-weekly sharing is common. During construction, updates may be needed daily. The frequency should be agreed upon in the BIM Execution Plan and aligned with decision points.
Can BIM models be shared with people who don’t use BIM software?
Yes. You can export PDFs, images, or use free viewers like Autodesk Viewer or Solibri Anywhere. For non-technical stakeholders, you can create simplified visualizations or virtual tours. However, they will not be able to edit the model, only view it.
What is a federated model?
A federated model is a combined model that brings together discipline-specific models (architecture, structure, MEP) into one coordinated view. It is typically created in a CDE by linking or merging the individual models. The federated model is used for clash detection and coordination.
How do you handle model updates from multiple disciplines?
Each discipline works on its own model and shares it to the CDE. The coordination lead then combines them into a federated model and runs clash detection. Issues are logged in BCF and assigned to the responsible party. This process repeats at each coordination cycle.
What is the role of a BIM manager in information sharing?
The BIM manager sets up the CDE, defines workflows, manages access rights, and ensures that the models are shared according to the BIM Execution Plan. They also coordinate the exchange of information between teams and troubleshoot technical issues.
Related
Formula used
in t | Finish time | min | 50 | 0 in d | Distance | km | 10 | 0 | 100000 out pace | Average pace | min/km | t / d | 2 out speed | Average speed | km/h | d / (t / 60) | 2
Each line is one input (in, sel, list) or one result (out: label, unit, formula, decimals). How the calculators work
Method: the standard formula for this calculation, rounded as each result states. See how the calculators work or report an error.
More cards in this drawer
- Secure Boot Battlefield 6 ASUS: Fix & Enable Guide
- Best Tech Websites to Follow for Pros & Beginners
- Second Wind Quest Walkthrough: Where Winds Meet6.00 min/km
- Enshrouded Weapon Upgrade Guide: How to Improve Gear5.00 min/km
- Connect Phone to Controller for Cloud Gaming
- Python Search Highlighting: Snippets & Matches