Improve Data Center Cooling Efficiency: A How-To Guide

Card No. 06·74662 · Updated · Standard formula, shown below

This guide walks you through practical, actionable steps to improve the cooling efficiency of an existing data center, reducing energy consumption and operational costs without compromising equipment reliability. You’ll learn how to assess your current setup, implement low-cost airflow improvements, optimize temperature setpoints, and leverage modern cooling technologies.

What You’ll Need

  • Access to the data center floor and equipment racks
  • Temperature and humidity sensors (portable data loggers are ideal)
  • Anemometer (airflow meter)
  • Thermal imaging camera (optional but very helpful)
  • Blank panels for unused rack U-spaces
  • Brush grommets for cable openings
  • Sealant or foam for gaps in raised floors and cable trays
  • Data center infrastructure management (DCIM) software or a spreadsheet for tracking changes
  • Permission from facilities or IT management to make changes

Step-by-Step

  1. Measure and baseline your current cooling performance. Place temperature and humidity sensors at multiple points: intake (front) of racks, exhaust (rear) of racks, and in the cold aisle. Record readings for at least 24 hours to capture peak loads. Also measure airflow from perforated tiles and under-floor plenum pressure. This gives you a baseline to compare against after making changes.
  2. Eliminate hot spots and cold air bypass. Walk the floor and look for obvious issues: missing blanking panels, open cable cutouts, and gaps around racks. Install blanking panels in every unused U-space, seal cable openings with brush grommets, and use foam or tape to close gaps between racks and under raised floors. This ensures cold air reaches the equipment intakes instead of escaping.
  3. Implement hot aisle/cold aisle containment (or at least separation). If you don’t have containment, arrange racks so that fronts face each other (cold aisle) and rears face each other (hot aisle). Use ceiling panels or curtains to physically separate the cold aisle from the hot aisle. This is one of the most effective ways to improve efficiency by preventing mixing of hot and cold air.
  4. Optimize perforated tile placement and opening. Move perforated tiles to align with the intakes of high-density racks. If you have tiles with adjustable dampers, open them fully only where needed. In most cases, you should have solid tiles in the hot aisle. Use an anemometer to verify airflow at each tile; adjust to avoid over-provisioning.
  5. Raise the supply air temperature setpoint. Most IT equipment can operate safely at intake temperatures up to 80°F (27°C) or higher, per ASHRAE guidelines. Incrementally raise the cooling setpoint by 1-2°F (0.5-1°C) per week, monitoring equipment intake temperatures. This directly reduces chiller or compressor energy consumption.
  6. Increase return air temperature (if using chilled water). For chilled water systems, raising the supply water temperature (e.g., from 45°F to 50°F) improves chiller efficiency. This is only possible if you have adequate airflow and your cooling coils can still handle the load. Monitor humidity as well.
  7. Use variable speed drives (VSDs) on fans and pumps. If your fans and pumps run at constant speed, consider retrofitting with VSDs. They allow the cooling system to match the actual load, saving significant energy during off-peak hours. This may require an electrician and controls integration.
  8. Implement economization (free cooling). Depending on your climate and system design, use outside air (air-side economizer) or water-side economizer (cooling tower or dry cooler) when temperatures allow. This can drastically reduce compressor run time. Ensure you have proper filtration and humidity control for air-side economization.
  9. Balance airflow within the room. Check that perforated tiles are not placed directly in front of CRAC (computer room air conditioner) units, as this creates short-circuiting. Adjust floor dampers or tile placement to distribute air evenly. Use a thermal camera to identify areas of recirculation.
  10. Monitor and tune continuously. After each change, record new temperature and power data. Use DCIM software to track trends. Adjust setpoints and airflow as loads change. Cooling efficiency is an ongoing process, not a one-time fix.

Common Mistakes

  • Overcooling: Keeping the room at 65°F (18°C) when equipment allows 75°F (24°C) wastes energy. Always check manufacturer specs.
  • Ignoring blanking panels: A single missing blanking panel can allow hot air to recirculate and cause hot spots.
  • Poor sensor placement: Measuring only at the CRAC return gives a distorted picture. Always measure at rack intakes.
  • Making sudden large changes: Raising the setpoint by 10°F at once can cause thermal stress or alarms. Change gradually.
  • Forgetting about humidity: Too much humidity can cause condensation; too little can cause static discharge. Keep within ASHRAE recommended range (40-60% RH).

Tips

  • Start with the cheapest fixes (blanking panels, sealing gaps) before investing in new equipment.
  • Use a thermal camera to quickly identify hot spots and airflow problems.
  • Consider installing a variable speed drive on fans before upgrading the entire cooling unit.
  • If you have multiple CRAC units, turn off redundant units during low load periods, but ensure you have adequate redundancy for failure scenarios.
  • Document all changes and their impact on temperature and power consumption.

Troubleshooting

  • Hot spots persist after blanking and containment: Check for floor tile leaks, cable openings, or under-floor blockages. Use smoke to visualize airflow. You may need to add supplemental cooling (e.g., spot coolers) for high-density racks.
  • Humidity levels are unstable: Humidifiers/dehumidifiers may need calibration. In dry climates, consider adding a humidifier; in humid climates, ensure the cooling coil is removing enough moisture.
  • Chilled water temperature cannot be raised: Some older equipment may have lower temperature requirements. Check the manufacturer’s specifications before making changes. If you have a mix of old and new equipment, you may need to isolate the older equipment.
  • Airflow is insufficient from perforated tiles: Check if the under-floor plenum is too shallow or obstructed by cables. Increase plenum depth or add fans to boost pressure.
  • After raising setpoint, equipment intake temperatures exceed limits: This indicates airflow problems, not just setpoint. Re-evaluate your blanking and containment. You may need to increase fan speed or add more perforated tiles.

Frequently Asked Questions

What is the ideal temperature for a data center?

ASHRAE recommends an intake temperature range of 64.4°F to 80.6°F (18°C to 27°C) for most equipment. Operating at the higher end of this range saves energy.

How much energy can I save by raising the setpoint by 1°F?

Typically, for every 1°F (0.5°C) increase in supply air temperature, you can save about 4-5% on cooling energy. The exact amount varies with your system and climate.

What is hot aisle/cold aisle containment?

It’s a method of physically separating the hot exhaust air from the cold intake air using curtains or panels. This prevents mixing and improves cooling efficiency.

Do I need to shut down my data center to make these changes?

No, most changes can be done while equipment is running. Blanking panels and sealing gaps are safe to install during operation. Major changes like containment installation may require planning but can usually be done without downtime.

What is economization?

Economization uses outside air or water to cool the data center when conditions are favorable, reducing or eliminating the need for mechanical cooling (compressors). It’s also called free cooling.

How often should I monitor cooling efficiency?

Continuous monitoring is best. At minimum, review trends weekly and adjust setpoints as loads change. Use DCIM tools to automate alerts.